1- |
NATIONAL CEMENT CO. (NCC) - Tebbien - Cairo .
During 1984 and 1985 our office has been involved in engineering jobs concerning the third and fourth extension lines in NCC. The equipment was mainly German. The work included structural designs of some of the civil engineering parts of these extensions. Our client was NCC. Starting 1986 our office was - yet again - involved with NCC in designing a “Lika” blocks factory in the vicinity of the factory itself. |
|
|
2- |
BENI SUEF CEMENT CO . (BCC) - Beni Suef
The office was involved in this factory from the very beginning of an idea to completion and production. Working as consultants to KOBE STEEL of JAPAN (KSL), our office surveyed the site (the location was displaced from the originally chosen site), investigated it geotechnically then issued all design drawings - with the cooperation of KSL civil engineering team - to the consultant of the owner for revision then endorsement. Actual structural designs began 1989 and construction work started immediately afterwards. The main contractor was KSL and the civil engineering subcontractors were the Arab Contractors. The Erection subcontractor was Focchi of Italy . The theoretical production capacity was 1,000.000.00 Tons per annum but - practically - it achieved - at least - 20% more. The factory started production 1993. Presently KSL is negotiating with BCC for a second production line in the same factory with our office as consultants. |
|
|
3- |
HELWAN PORTLAND CEMENT CO. (HPCC) - Helwan - Cairo .
During 1991 HPCC commissioned our office - through the Arab Swiss Engineering Co. (ASEC) - to design a rather complicated structure comprising a new slurry mill inside existing production lines in its premises. Design and supervision of execution lasted around one year. |
|
|
4- |
ASSUIT CEMENT CO. (Assuit CC) - Assuit
During 1995 our office was commissioned by ASEC to investigate the evaluation of a new limestone quarry and to design access roads for the quarrying equipment for this new quarry. |
|
|
5- |
AMERIA CEMENT CO. (Ameria CC) - Ameria - Alexandria
During 1997 office was commissioned by ASEC to rectify an inclination that took place in the concrete shaft of the clinker storage hall at Ameria CC. The shaft is about 40.00 m high and 4.50 m in diameter. The hall itself has a diameter of 100.00 m. Work is still being carried on in this job. |
|
|
6- |
TORRAH PORTLAND CEMENT CO. (TPCC) - Torrah - Cairo
Several jobs were and currently being done by our office in TPCC. Through ASEC our office has designed - during 1996 - the civil engineering parts for two new cement mills. |
|
|
Apart from the usual structural designs, special foundations in the form of micopiles were carried out. Our office carried out between 1996 and 1997 a series of remedial designs for old cement mills in the site. During 1997 - our office designed the civil engineering parts of two new precalciners among an upgrading scheme. Work in these two precalciners is nearly over.
|
|
|
7- |
ALEXANDRIA PORTLAND CEMENT CO. (APCC) - El Maks - Alexandria
Through ASEC our office was commissioned 1994 to the present 1998 to three jobs ; a new slurry mill, a new cement mill and - lastly - a new cement silo.All three structures within the boundaries of the already existing factory. Since 1998 our office signed a contract with The Arab Contractors - Alexandria Branch - to design and supervise the new production line (Kiln No. 5) of 1,000,000.00 tons per annum in the property of APCC. The machine suppliers are Danish and the Arab Contractors will do both civil as well as erection work. Our scope also includes shop drawings, rebar lists and CLAIMS . Our work is further extended by a new commission from our client to design the “ Preheater Tower ”. The initial idea by the suppliers was for a reinforced concrete preheater. The new structure will be a steel tower overlying concrete floors. The tower is 75.00 m high and is currently (December 1998) being designed in our office. The designed parts - the raft so far - has already been constructed after endorsement by the owner's consultant. |
|
|
|
|
|
8- |
MISR CEMENT COMPANY (MCC) at Gayadah - Beni Suef
For client KOLALY our office has been engaged in the first phases of this project by geotechnically investigating the site and recommending the location and alignment of different structures and items. |
|
|
9- |
THE ARAB CEMENT CO. (ACC) - at El-Koraymat
For client KOBE STEEL LTD. JAPAN our office has been engaged in the first phases of this project in surveying and geotechnical investigation. Further stages of cooperation with KSL in this project are currently under discussion. |
| |
|
10- |
SINAI CEMENT COMPANY (SCC)
About 60 km south of El – Arish northern Sinai. Our office has been engaged in geotechnical work in the site. Our current (August 1999) engagement is to verify foundation levels and designs prior to construction. |
| |
|
11- |
MISR CEMENT COMPANY AT QENA ( MCC-Qena )
The most recent project in hand (Since July 1999) is the MCC-Qena. It lies nearly along the highway to safaga on the Red Sea . The current phase after geological and geotechnical investigations is supervising site excavations and procedures. |
| |
|
12- |
SINAI CEMENT COMPANY (SCC) “WHITE”
Back to back from the site of the first factory – see 10 above – a similar factory is being constructed to produce white cement. ECO has – and still does – the same jobs done in the first factory which has – then - been named the “Grey” cement factory |
| |
|
13- |
SOUTH OF VALLEY CEMENT FACTORY
ECO has been involved in this project since it first intended to be near Kharga Oasis in the New Valley Governerate in the Western Egyptian desert. Then – during 2000 – in its new and final location east of Beni Suef adjacent to the site No 9 above. |
| |
|
Our office is - so far - the only outside consultant that works in conjunction with “The Arab Swiss Engineering Company” (ASEC). ASEC is a mainly Egyptian, multinational engineering company that works - almost solely - in cement factories and relevant industries. |